Fix to all
substrates
-
Use existing tools
available to tradesperson
-
Fix with or without
joint
-
Use at
strategic points in a job such as when doing a random rubble
wall and support is needed at certain points to hold big pieces
of stone
-
Put the kerfs
in at selected points to accommodate it you don't weaken edge by
putting a continuous cut along along the top and bottom edge (this eliminates a channel for water to collect and freeze in
winter. Thus, busting the front faces on the panels)
-
Adapt to be used if
kerf is already cut (if kerf is wider than 2.2mm, StoneClips can
be ordered with a thicker front round or dual disc, up to 3mm
available)
-
Order panels already
with kerf cut and a suitable StoneClip is available on
consultation with our office
-
Hang and support:
- Timber beams in vertical position
- Aluminium panels on outside and inside of buildings
-
If you get kerf cut
into panel on the hanging side in the factory, it greatly reduces cost in
horizontal cladding (on it's back)