improved-6-and-12mmunistrut09

showing the new adjustable StoneSub fixing with a 6mm and 12mm
adjustable shaft, this system is suitable for all shaft sizes and also
suits working on curved substructures.

stone


Showing the new SB-5 StoneSub with the Top & Bottom
fixing in position to carry 30 mm thick panels and the set StoneSub fixing
with the ShockClip mounted onto it .

stone

The Top & Bottom fixing ( 12 mm only ) with a 100 mm long
shaft .

stone

Showing theOriginal Stonesub mounted onto the StoneSub 42mm x 42mm Channel

stone

Showing the tools needed for tradesman like installation .
the 125 mm wet cutter , the 6 mm Router and the 100 mm diamond grinder .

stone

Showing the underside of a 30 mm thick panel of Sandstone
with the Top & Bottom bracket installed so it is flush with bottom of panel

stone

Showing the top & Bottom bracket installed into a 30 mm
thick piece of Blue Stone.

stone

Showing the shaft sticking out the back of the panels and
how snug they fit when installed --the carry the load above without any
Epoxy

stone

Showing the front panels flush after installation of the
clips .




stone

SB-5 with DOUBLE HEAD x 16mm Shaft

Stoneclip.com was invited to supply the fixing medium for the cladding of the 50 mm thick Sandstone cladding panels ( 750 mm x900 mm x50 mm thick =87 kgs/panel) to be erected onto the façade of the Stamford Properties new building being built by St Hilliers Construction in the Rocks area of Sydney. The cladding company is Stone-Tech Pty Ltd and they undertook the testing, which was overseen by Mr Thomas Yang (engineer) of the Sydney branch of Aurecom on behalf of the owners. The tests of the stone panels (Guinea Gold) and the StoneSub substructure cladding system took place at Stone - Tech's depot in Northmead on 30/6/10 and were carried out by Mr Campbell Scott (Stone-Tech)and witnessed by the engineer, Mr Bruce Kane and Mr Daniel Pribadi of St Hilliers and Mr John Redhead of Stoneclip.com. The tests took place over 5 consecutive loadings to the ultimate test of 7 of the slabs being loaded onto the StoneSub brackets which were supporting the Sandstone panels. Each of the test loads took 30 minutes to complete. The test results at the end supplied by Mr Yang ( engineer ) rated the fixing system as having a wind load rating of 4.5 KPa which is really high, our old Unit-Strut system was rated at 2.92 KPa. This new high result of the wind load and dead load capability is because of our new channel nut which is very unique in its design. At the finishing point the fixing system did not fail - the stone panels failed as shown in the 2nd photo when the 8th slab was being loaded on. The cladding on the building starts on the first week of August 2010

stoneclip